Credit: Brian Rose for David Baker + Partners Architects
Project Details
Project: Folsom + Dore
Apartments, San Francisco
Size: 79,100 s.f. (98 residential units + common area)
Cost: $26.5 million
Completed: February 2005
Architects: David Baker + Partners and Baker Vila Architects
General Contractor: Cahill Contractors
Client/Owners: Citizens Housing Corp.
Consultants: Partnership for Advancing Technology in Housing; Steven Winter Associates
If you’ve bought into the belief that building green, and especially to LEED standards, is only affordable at the upper end of the housing price spectrum, take a good look at Folsom + Dore Apartments in San Francisco. The 98-unit rental project on a half-acre brownfield site offers reasonable, long-term lease rates to a mix of low-income residents—including former homeless and disabled folks living far below the city’s stratospheric average income level—with a shining example of how sustainability extends far beyond a building’s shell and component parts.
The project’s “green by design” approach began with its site, the redevelopment of a parking lot fronted by an abused, brick-fronted warehouse and dry-cleaning operation. Located in the city’s historic and vibrant SoMa (south of Market Street) neighborhood, within reasonable walking distance to various public transportation options, the site afforded a reduction in the number of parking spaces per unit. The master plan includes only 30 vehicle spaces, supplemented by 28 bicycle stalls and a car-share pod as part of a citywide program.
That variance allowed the architect the freedom and footage to set back the building’s multicolored sections and provide balconies for several units. The design helps break up the building’s mass and makes it appear more like row houses than high-density (much less low-income) rentals, a critical element to its acceptance and integration into the neighborhood.
The building design also created outdoor corridors and courtyards that not only provide respites from its busy urban location, but also serve a functional role as breezeways to help passively cool the common areas and individual units. In fact, there is no mechanical air conditioning, saving significant initial and operating costs. In addition, heat recovery devices fed by waste bathtub drain lines supplement baseboard hydronic heating systems that deliver water and space heating in each unit to further reduce expenses and ongoing costs. Utility bills range from $18 to $23 per month per apartment.

Credit: David Baker + Partners Architects
EFCO commercial-grade fixed and operable windows feature high sound transmission coefficient, water- and air-infiltration, and solar heat gain coefficient ratings and low U-values to promote thermal efficiency, allow passive ventilation and cooling, and create more quiet and comfortable interiors. 800.221.
4169. www.efcocorp.com.
The design-build team preserved the brick façade of the building to maintain a semblance of continuity, in part to soothe some neighborhood concerns about the project and also to front the new common areas, which include offices for on-site managers, a computer lab, and open recreation and indoor and outdoor gathering and play areas for residents. The enclosed 3,500-square-foot, street-level common area, specifically, combines commercial-grade insulated windows, finished concrete flooring (with fly-ash content), and compact fluorescent lighting.
The specs also include other near-requisite telltales of green building, such as no-VOC coatings, Energy Star–qualified appliances, recycled-content flooring, formaldehyde-free insulation, and even a 13-kw rooftop photovoltaic array (afforded by cost savings elsewhere in the budget) to supplement the utility grid for the common-space electrical load. All of this contributed to the project achieving a LEED-Silver rating.
Going green is nothing new to the building’s owner/developer, the non-profit Citizens Housing Corp. (CHC). Though Folsom + Dore was the developer’s first foray into a formal green building process, CHC has always believed that sustainable development is simply smart business.
“As the developer and the property manager, it’s important for us to maximize efficiencies in the process and the materials to achieve long-term durability,” says Scott Falcone, CHC’s development director.
Incorporating production and operational efficiencies is also critical to CHC securing financing for its projects. Folsom + Dore Apartments benefited from five financial sources, including tax credits and tax-exempt bonds, as well as about $14 million from state and local funds that set thresholds for energy efficiency and indoor air quality. “Meeting those thresholds increases our ability to access those funds in a very competitive environment,” says Falcone.
To access those public funds, the project also had to comply with low-income housing thresholds by offering 50 units for residents earning up to 60% of the city’s average median income, and 46 units for those earning a mere 27.5% of the area’s median income within the 98-apartment plan. (The remaining two units are for the on-site managers.)
CHC’s efforts, boosted by a grant from the federal Partnership for Advancing Technology in Housing (PATH) program for additional consulting services to demonstrate “affordable green” at Folsom + Dore, also helped attract private financing to bridge gaps in the $26.5 million budget. “Most cost-benefit analyses for green investments show a [financial] savings and a faster payback for the lender because of the reduced operating costs,” says Falcone.
If the financial model penciled out, the reaction from the inhabitants is even more positive. Chronically ill residents report feeling healthier and more vibrant thanks to the fresh air and native vegetation in and around the complex. Though the building is professionally managed, renters have assumed responsibility to maintain common areas, and take pride in the building’s appearance and performance.
“They’ve embraced the sustainability of the building and translated it into sustainable lifestyle habits,” says project architect Daniel Simons, AIA, who gained accreditation as a LEED provider (third-party verifier) during the project. “The ideals of the project are carrying on beyond the building itself.”
It’s a model that the entire project team hopes will inspire others to follow. During construction, in fact, CHC shared best practices among five projects it had in various stages of development at the same time, while the architect and general contractor have forged niches in the green space and PATH promotes the success of Folsom + Dore nationwide.
“This project is a powerful tool to convince people and clients that building affordable and green is possible,” says Simons. “It may be hard, but it’s not out of reach, and convincing people of that is critical to doing more projects like this.”
Rich Binsacca is a freelance writer in Boise, Idaho.
PROFILE:
Taylor Robinson
Project manager, cahill contractors

Credit: Sharon Risedorph
With a master’s in civil and environmental engineering and a past life in investment banking, Taylor Robinson may not seem like your typical builder. But she just might be the face of the next generation.
As the project manager on Folsom + Dore Apartments for Cahill Contractors, fresh off earning her advanced degree with a focus on green building (and specifically the LEED rating system), Robinson reinvigorated the client’s initial desire to gain LEED certification and spearheaded the effort during the last four months of production. “Taylor was the catalyst for getting us back on track [to meet LEED requirements],” says architect Daniel Simons, who was inspired by the process to gain LEED accredited professional standing. “She worked to find the dollars to afford the documentation, testing, and commissioning required,” as well as leveraging a contingency fund to help finance a photovoltaic system.
It also helped that the project was entering the finish phase of construction, leaving just enough leeway to modify the specifications to earn LEED credits and even regain a few. “It was far from ideal timing, but I assessed what they’d already done and thought we could make it,” says Robinson, who at the time was a founding member of the local USGBC’s emerging builder program, which gave her ready access to best practices.
Now working for a developer, Robinson has more control over making green a priority. “You have to talk about it early and often if you want to be successful at it,” she says. “Green building isn’t just one thing, but all of your decisions, your entire thought process, about what’s best.”